Water Damage Reconstruction Estimate with Overhead and Profit

Scoping & estimating · video 2 of 8 · 2:09 · Watch on YouTube

How to write the reconstruction estimate for a water loss as its own estimate in vPlan AR: Draft with AI writes the rebuild (drywall, insulation, baseboard, flooring, paint) with quantities from the floor plan, vPlan counts the trades, and overhead and profit (10% and 10% to start) are added when the job takes three or more trades. The Damage / Scope Report prints mitigation and reconstruction apart.

In this video

  1. Switch the Scope tab to Reconstruction: the rebuild, a separate estimate from the mitigation
  2. Draft with AI writes the rebuild from the damage recorded, assuming the mitigation is done
  3. Quantities from the plan: drywall 2 ft up is the perimeter times 2, with how each was worked out
  4. Edit quantities and formulas, or add lines from your rate card, the packs or your own items
  5. vPlan counts the trades: three or more, and overhead and profit apply
  6. Set overhead and profit in Settings, Estimate Rate Card (10% and 10% to start)
  7. Export the Reconstruction estimate: overhead and profit on their own lines, after waste and contingency; include or leave them out for one estimate
  8. The Damage / Scope Report prints the mitigation and reconstruction scopes apart, for the adjuster

Transcript

Once the basement is dry, the rebuild is its own estimate: the reconstruction. Here's the same sewage backup, rebuilt.

Open the Scope tab and switch to Reconstruction. It starts from the same damage, but assumes the mitigation is done and estimated separately.

Draft with AI writes the rebuild: new drywall two feet up the walls, insulation, baseboard, carpet and pad, and paint so the walls match.

The drywall line is the room's perimeter times two feet, not the whole wall, and the line says how it was worked out.

Change anything. Type a quantity, edit a formula, or add a line from your rate card, the starter packs or your own items.

Above the lines, vPlan counts the trades: drywall, insulation, finish carpentry, flooring and painting. With three or more trades, overhead and profit apply.

You set them once, in Settings, Estimate Rate Card: overhead and profit, ten and ten to start.

Export the Cost Estimate, Reconstruction, and they're added after waste and contingency, on their own lines. For one estimate, you can include them or leave them out.

The Damage / Scope Report prints both estimates' scopes for each room, mitigation and reconstruction apart, for the adjuster.

If you wrote scopes before the three estimates, they open as the reconstruction, and vPlan offers to move any mitigation lines to the Mitigation estimate.

Next: scoping damage that covers only part of a room.