Mold Remediation Scope of Work and Estimate from a Floor Plan

Scoping & estimating · video 4 of 8 · 2:19 · Watch on YouTube

How to write a mold remediation scope and estimate with vPlan AR: record the mold behind a bathroom wall, and Draft with AI writes the mitigation the way the IICRC S520 standard lays it out (containment with HEPA negative air, removal past the visible growth, HEPA vacuuming and cleaning of the framing, PPE, verification recommended). Then edit a line and draft the rebuild as its own estimate.

In this video

  1. Record mold under Condition & Damage, with where it is and how high it reaches
  2. Draft the mitigation following IICRC S520: containment with HEPA negative air, moldy drywall and insulation removed past the visible growth, framing HEPA vacuumed and cleaned, PPE
  3. A biocide never replaces removal; Check on site recommends independent post-remediation verification
  4. Change any line: type a quantity, or write a formula like the perimeter times four
  5. Add single lines with Add a line, or a whole pack with Pack
  6. Draft the reconstruction as its own estimate: it puts back what the mitigation took out
  7. Export each as a Cost Estimate: PDF, CSV or Excel

Transcript

Mold behind a bathroom wall needs containment, air scrubbing and careful removal before any rebuild.

Scan or measure the bathroom with the vPlan app, and open the project here.

Select the bathroom and record mold, moderate, with the drywall, insulation and baseboard affected. Note where it is and how high it reaches: about four feet up the wall behind the tub.

In the Scope tab, draft the Mitigation estimate. It follows the IICRC S520 standard for mold: containment with HEPA negative air, the moldy drywall and insulation out with a margin beyond the visible growth, the exposed framing HEPA vacuumed and cleaned, and PPE. A biocide never replaces removal.

Check on site recommends post-remediation verification by an independent indoor environmental professional before the wall is closed.

Change any line the draft got wrong: type a quantity, or write a formula. The perimeter times four is a four foot flood cut, and a formula follows the plan when the room changes.

Add a single line from the rate card or a pack with Add a line, or a whole pack at once with Pack.

Then switch to Reconstruction. The draft puts back what the mitigation took out: drywall, insulation, baseboard and paint. Its own estimate, with its own total.

Export each as its own Cost Estimate, as a PDF for the customer or a CSV or Excel file for your own templates.

Next: fire and smoke, with your own line items.