How to Make a Repair Estimate from a Floor Plan with Your Own Rates

Claims & inspections · video 4 of 6 · 1:38 · Watch on YouTube

How to make a preliminary repair cost estimate from a floor plan in vPlan AR: set your own rates in the Estimate Rate Card (material prices, waste and contingency, pack rates and your own items), then export a Cost Estimate priced from the scope of work, as a PDF for the customer or CSV / Excel for your bid template.

In this video

  1. In Settings, open Estimate Rate Card
  2. Set a price for each material, and the waste / contingency percentage
  3. Starter pack rates sets each pack line’s price; My items adds your own codes, descriptions, units and rates
  4. Save the rate card: every estimate uses it (on Business, a team can share one price book)
  5. In the editor, click Export and choose Cost Estimate
  6. Rooms with a scope are priced from their lines; rooms without one from their affected materials
  7. Optionally include the finishes: floors, paint, ceilings and baseboard on every level
  8. PDF for the customer, or CSV / Excel with each line’s code, formula, quantity, unit and rate
  9. Grouped by room, with the subtotal, waste and contingency, and the estimated total

Transcript

Once the scope is written, vPlan can price it. Here's how to make a preliminary repair estimate with your own rates.

First, set your rates. In Settings, open Estimate Rate Card.

Set a price for each material, and the waste and contingency percentage added to the subtotal.

Starter pack rates sets the price of each line in the packs, and My items adds your own codes, descriptions, units and rates.

Save the rate card. Every estimate you export uses it.

On Business, a team shares one price book, so everyone prices the same way.

Now open the project and click Export. Choose Cost Estimate.

Rooms with a scope are priced from their line items. Rooms without one are priced from their affected materials.

You can include the finishes too: the floors, paint, ceilings and baseboard on every level.

Pick PDF for the customer, or CSV or Excel for your own bid template, with each line's code, formula, quantity, unit and rate.

The estimate is grouped by room, with the subtotal, waste and contingency, and the estimated total.

Cost estimates are part of Pro and Business.

Next: the claim package, with the reports and measurements you send.